








 | |

|
Plumbing Peer Review < (Click hyperlink to view details)
Over (70) Pages and Spreadsheets, including:
 | Coordination Between Disciplines |
 | Plumbing Plan Review Items |
 | Plumbing Equipment Schedule Items |
 | Plumbing Riser Diagram Items |
 | Plumbing Detail Drawing Review Items |
 | Plumbing Code Review Items |
 | Help Files and "Extras" |
|
|
|
62.1-2010 & 2013 Comply-VAV < (Click hyperlink to view details)
User-friendly and fast Compliance
Calculations and OA "Optimization", including:
Now available in 62.1-2013 Comply-VAV Version
(Both I-P and SI Units)
 | ASHRAE Standard 62.1-2010 &
62.1-2013 "Ventilation Rate Procedure" Compliance |
 | Calculations Take-off
Forms, Tables, & Diagrams |
 | Calculations for Typical
Air Handling Unit Types |
 | Design and Calculation
Assumptions |
 | Determining Occupancy (Zone
Population) |
 | Air Distribution
Configuration (Table & Diagrams) |
 | "Optimizing"
Outdoor Air (OA) Requirements |
 | Compliance Documentation |
 | Extensive Help Files and
"Extras" |
 | I-P (Inch-Pound) or SI
units available in 2010 version and in 2013 version |
 | Now includes
"VAV Scheduler"© for VAV
Terminal and Reheat Coil selection and for ACAD Schedule input. |
ASHRAE 62.1-2013 Dedicated
Outdoor Air Systems (DOAS) < (Click hyperlink to view details)
DOAS - Required Outdoor Air calculations for compliance with ASHRAE
Standard 62.1-2013, and psychrometric calculations to determine
supply air condition to offset internal Latent Loads.
 | ASHRAE Standard
62.1-2013 "Ventilation Rate Procedure" Compliance
- I-P (Inch-Pound) units |
 | Calculations Take-off
Forms, Tables, & Diagrams |
 | Calculations for DOAS Air Handling Unit |
 | Design and Calculation
Assumptions |
 | Determining Occupancy (Zone
Population) |
 | Air Distribution
Configuration (Table & Diagrams) |
 | DOAS Loads to offset internal Latent Loads |
 | Compliance Documentation |
 | Extensive Help Files and
"Extras" |
|
ASHRAE 100 Energy Goal
Calculations < (Click hyperlink to view details)
Energy Goal Calculations and Interactive
Forms (A, B, and C) for compliance with ASHRAE
Standard 100, "Energy Efficiency in Existing Buildings".
 | "Compliance Requirements" |
 | Form A, "Compliance with ASHRAE Standard
100" |
 | Form B, "Building Activity and Energy
Target" |
 | Form C, "Energy Use
Reporting" |
 | "Building
Activity and Energy Target" |
 | Table B-1, "US and Canada Climate Zones" |
 | Table 7.3, "Building Operating
Shifts Normalization" |
 | "Help"
file |
|
|
|
|
System Requirements
For full functionality of all Software Programs, it is recommended
that your system have at least the following configuration:
 | Operating System: Windows® 98, 2000, XP, Vista,
or Win 7 |
 | Processor: Pentium® or equivalent |
 | RAM: 500 MB (recommended) |
 | Disk Space: 50 MB (recommended) |
 | Software: MS Word®, MS Excel® |
|
|
|
In-Progress
Software < (Click hyperlink
to view details)
Check back soon for additional software, including:
 | |
 | Network Versions of all Programs |
 | .... and more to come |
|
|
Home | Software
| Prices/Orders | FAQ | About Us | Contact Us | Search
Copyright © 2018 - HVAC Design Solutions
|